S05C

713 – Buckeye RR

Herm Botzow

OPS SESSION—Saturday, 1:00 pm
— 4:00 pm
Location—Swanzey, NH
Distance from Hotel—64 Miles
Scale—O
Operator Limit—6 People
Control system —NCE
Scenery Completed — 100%
Accesibility—Not HC Accessible
Parking—6

The layout has a 365′ long single track mainline and uses NCE DCC. It operates as a subsidiary of the New York Central, between terminals at Ashtabula, Ohio and Pittsburgh, PA., during the transition from steam to diesel. There are five intermediate villages, with wayside industries; four with passing sidings. There is also a parallel B&O highline, with no sidings. The terminals are back-to-back, allowing through running and re-staging. Four-hour operating sessions involve 30 passenger and freight trains, and are controlled by a dispatcher, using my 2-way radios.