E11A

513 – New Haven and Connecticut Central

Dick Fralick

OPS SESSION—Thursday, 1:00 pm
— 4:00 pm
Location—Greenland, NH
Distance from Hotel—45 Miles
Scale—HO
Operator Limit—6 People
Control system —Digitrax
Scenery Completed — 95%
Accesibility—Not HC Accessible
Parking—On street

Dick’s switching layout consists of 50’ by 1’ wide shelf layout that is fully sceniced, and is connected via a wye to the two level 30’ x 6’ peninsula with a dual track helix. One end represents the New Haven 50s – 60s, the other end is operated by the Connecticut Central, circa 1985 – 2000. The track work on the peninsula is near completion, which allows for operations. The layout is accessed by a stairway from the garage to the basement. The layout uses Digitrax DCC.