FGLK

Finger Lakes Railway (LakeShores Division)

Paul Stamp

OPS SESSION—Friday, 2:00 pm
— 5:00 pm
Location—Bergen
Distance from Hotel—23 Miles
Operator Limit—8 People
Layout size—22' x 24'
Control system —NCE/WiFi
Scenery Completed — 10%

This is an under-construction, local regional shortline railroad set in the years 2015-2020. All power is  sound equipped. Car forwarding is done with switch lists and communication is face-to face, as trains navigate the hub & spoke routes – just like the prototype.

Completed Track: 85%

Completed Scenery: 5%;

Paul’s “TierLineCustoms” YouTube channel (link above) has layout construction videos.

*Note: There is a dog in the house.