---
---
Situated in a wooded hillside, our 1.20.3 F/FN3 railway focuses on operation with multiple operators, waybills, dispatching, and train orders. Starting out in 1988 with a simple figure eight, we became addicted to garden railroading. Thirty-six years later, the railway has grown to over 5000 feet of track with over 50 bridges and 20 tunnels. The evolution, construction, and operation of the SJR&P Railway will be the topics of this clinic.