HO MEC Mountain Division Operating Layout. Large, two level fully operational layout. Transition era with close reproduction of proto-type track plans and buildings. Many scratch-built and kit bashed structures. Built using the Domino benchwork and planning system developed by David Barrow. Layout uses the new TCS wi-fi control system.