609 – Maine Central Mtn Division

Bill Huebner

LAYOUT TOUR — Friday, 9:00 am
— 12:00 pm
Location — Epping, NH
Distance from Convention Hotel — 40 Miles
Scale — HO
Scenery Complete — 30%
Accesibility — Not HC Accessible
Parking — On street

HO MEC Mountain Division Operating Layout. Large, two level fully operational layout. Transition era with close reproduction of proto-type track plans and buildings. Many scratch-built and kit bashed structures. Built using the Domino benchwork and planning system developed by David Barrow. Layout uses the new TCS wi-fi control system.